Time to first oil is a critical issue for many operators. The earlier a well can be connected the sooner production flows. Completing a metrology as soon as the well has been installed allows for the spool-piece/jumper to be fabricated while the well is being completed. Follow this up with a quick check inertial metrology (perhaps from the rig) prior to the installing of the jumper in the middle of very complex simultaneous operations (sim-ops) allows for very cost effective and safe subsea operations.
Our fully proven solution has already saved many $100,000’s of dollars in exactly these situations.